HomepageAbout UsContactProductionPrefabricationConstructionServicesRecyclingReferences

01


High-rise Building

  • Faster construction;
  • Better quality of concrete with very high final strength;
  • Good static and fireproof properties;
  • Large free rasters, up to 31m;
  • Production independent of weather conditions;
  • Possibility of disassembly and reassembly;
  • Less burden on the environment (reduction of noise, dust and emissions of hazardous materials, less waste, simpler waste treatment).

The process of production of prefabricated concrete elements begins immediately after the approval of the project and takes place in parallel with the preparatory and earthworks. This type of construction gives the contractor a significant initial advantage, the facility is closed in a short period of time so that work on interior positions can begin much earlier.

High-rise building

As prefabricated concrete elements are produced in factory and controlled conditions, low temperatures in winter do not affect production dynamics and product quality. Prefab construction can be installed in the winter months, allowing the project to run on schedule regardless of weather conditions. Thanks to our rich experience, our engineering team represents the ideal partner in the matter of choosing the appropriate precast concrete elements, adopting the grid, creating a static project and an assembly project.


As an engineered, highly controlled product, prefab construction can be customized in many ways to meet many design challenges. Its properties must be well known in order to maximize efficiency in production, delivery, assembly and maintenance. The advantages of precast concrete construction come to the fore in every project, at different stages of construction. By working on a project in a precast system at an early stage of planning, the advantages offered by a precast system can be maximized

High-rise building

The fully automated production process as well as the use of concrete structures protect the environment in several aspects:

Check

The environment in the factory where the workers work remains clean, without noise, dust and toxic fumes;

Check

Recycling waste material from the production process is simpler in factory conditions; every part of the process can be easily monitored and controlled;

Check

Self-setting concrete does not need to be vibrated during installation, therefore the noise level during casting is low and the whole process takes less time;

Check

Working in a factory largely eliminates the dirt, aggravating circumstances and dangers that are present on the construction site;

Check

For prefab constructions, ecological dismantling and recycling are applied instead of noisy and dusty demolition.

Quote

Over time, the precast concrete system has proven to be very durable and adaptable, with new design concepts and technological achievements. We place the high quality, speed of transportation and assembly of prefabricated concrete construction as our biggest asset with which we present ourselves to investors.

High-rise building

02

LOW Construction

The experience we have gained over the years and the machinery that we continuously supplement and modernize, while using innovative techniques and quality building materials from our own resources, we are ready to respond to many requests of our clients in the field of civil engineering.


Earthworks and road infrastructure


The construction operation relies on its own production capacities and proven construction materials, with constant professional control by construction engineers. Using modern machines and special equipment for construction work, our team performs the work with quality, safety and without breaking the given deadlines.

Quote

Over time, the precast concrete system has proven to be very durable and adaptable, with new design concepts and technological achievements. We place the high quality, speed of transportation and assembly of prefabricated concrete construction as our biggest asset with which we present ourselves to investors.

LOW Construction

We specialize in the following works:

  • Construction of roads and parking lots, with associated infrastructure;
  • Production of the bedding of the lower and upper supporting layers (0-31mm, 0-63mm);
  • Execution of asphalt works;
  • Construction of concrete pavements;
  • Rehabilitation and maintenance of main, regional and local roads;
  • Execution of earthwork excavations;
  • Performing clearing and preparatory works;
  • Carrying out finishing works;
  • Execution of soil remediation projects;
  • Carrying out deep excavations with the provision of slopes of excavations with Larssen piles;
  • Construction of protective embankments;
  • Construction of New Jersey protective barriers;
  • Mounting Betonblock system;
  • Excavation works of tunnels and access portals on tunnels and export of materials.
  • Surface paving, production, and installation of curbs and canals;
  • Production and installation of piers.
LOW Construction

03

Hydro construction

Our expert team of engineers and machinists, the modern machinery at our disposal and the experience we have gained over time achieve excellent results in the field of hydraulic engineering - high-quality, economical and safe performance of works, in a short period of time, even in unfavorable conditions.

Hydro
construction

Regulation of river beds

Put Inženjering performs hydro construction works within the framework of regulating river beds.


Our experienced team of engineers and machinists, modern machinery at disposal and experience that we acquired in time, attain excellent results– high quality, cost-effective and safe performance of works, in short deadlines, even in unfavorable conditions.

We specialize in:

  • Earthworks which include machine and manual excavations, subsoil formation, building embankments, securing embankment slopes and waterway cuts, designing buttoms of waterway beds, transport of earth materials, etc;
  • Works on water drainage which include the excavation of drainage canals and drains with transportation, building concrete curbs, ducts and drain pipes;
  • Stoneworks which include building slopes and stabilizing cut-off trenches by using gabions;
  • Concrete works which include constructing concrete mattresses on the bottom and slopes of river beds, cut-off trenches and bolsters, constructing stabilizing concrete bands, etc.

Construction of sewage networks

Our services are:

  • Removal of the existing sewer systems in the case of reconstruction;
  • Trench excavations for placing sewer pipes and out freight of excavated earth;
  • Trench and sides planking and strutting in case of loose terrain;
  • Backfilling, spreading and leveling sand in the trench;
  • Installing sewer pipes;
  • Filling in the trench.
Construction of sewage networks

Construction of hydraulic facilities

Hydrotechnical objects represent expensive objects of wide social interest. Therefore, the responsibility of the construction contractor is great. That is why we are fully equipped with all the necessary technical-technological and human resources and we constantly strive to improve efficiency and professionalism.

We have experience with the construction of buildings and plants for:

Using water hydro energy (construction of the hydropower plant, with a dam and other facilities – MHP ″Vrgudinac″ on the Nišava, about 2.5 km downstream of Bela Palanka); Water protection (realization of the plant for the treatment of water from residential areas and industry – Central plant for the treatment of wastewater, downstream of Bogojevce, in the Municipality of Leskovac).

Quote

Our continual growth and stable operation have resulted in the expansion on the market of building. Today, apart from building construction and infrastructure works, Put Inženjering operates in the field of constructing hydro-technical facilities. We tend to ensure a professional attitude and be a reliable partner to all investors stakeholders because we find each design unique and challenging for us.

Construction of hydraulic facilities
Put Inzenjering
Put Inzenjering Map

Niš

  • Ruzmarina 25, Donja Vrežina, 18103 Niš
  • +(381) 18 215 355
  • Office@putinzenjering.com
  • Pon - Pet: 07 - 15h

Nova Pazova

  • Prya centralna radna 3, 22330 Nova Pazova
  • +(381) 22 215 22 25
  • Mobeco@putinzenjering.com
  • Pon - Pet: 07 - 15h

Slovenia

MOBECO
  • Velika vas pri Krškem 62, 8273 Leskovec pri Krškem
  • +386 (0) 8 20 10 375
  • office@mobeco.si
  • Pon - Pet: 07 - 15h

© 2026 PUT INŽENJERING by Croonus Technologies